Costs and revenue of the firm
JAMBWAECNECO
What the syllabus asks
JAMB: Theory of costs and revenue: concepts of cost (fixed, variable, total, average, marginal); accountant’s and economist’s views of cost; short-run and long-run costs; concepts of revenue (total, average, marginal) and their relationships
WAEC: Cost and revenue concepts: fixed, variable, total, average and marginal costs; short-run and long-run costs; opportunity, explicit and implicit costs; total, average and marginal revenue; relationships between cost curves; profit maximisation (MC = MR); break-even and shut-down points
NECO: Cost and revenue concepts: fixed, variable, total, average and marginal costs; short-run and long-run costs; opportunity, explicit and implicit costs; total, average and marginal revenue; relationships between cost curves; profit maximisation (MC = MR); break-even and shut-down points
What you will learn
- Distinguish fixed, variable and total costs and the short run from the long run.
- Calculate AFC, AVC, ATC and MC from a cost table and describe the shapes of their curves.
- Distinguish the accountant’s view of cost from the economist’s view (explicit, implicit and opportunity cost).
- Calculate TR, AR and MR and explain their relationships under perfect and imperfect competition.
- Apply the profit-maximising rule MC = MR.
- Explain break-even and shut-down points and the long-run average cost curve.
Key points
- Short run: at least one factor fixed; long run: all factors variable.
- TC = FC + VC; FC is a horizontal line; TC starts at FC.
- AFC = FC/Q (always falls); AVC = VC/Q; ATC = TC/Q = AFC + AVC.
- MC = TCₙ − TCₙ₋₁; unaffected by FC; U-shaped because of diminishing returns.
- MC cuts AVC and ATC at their minimum points.
- Economist’s cost includes implicit (opportunity) costs and normal profit.
- TR = P × Q; AR = price; MR = ΔTR; MR = AR only if price is constant.
- Profit is maximised where MC = MR.
- Break-even: P = ATC; shut-down: P = minimum AVC.
- LRAC is U-shaped because of economies and diseconomies of scale.
Start here: Meaning of cost; short run and long run
Mrs Adeyemi runs a bakery in Ibadan. Every month she pays rent for the shop, interest on the loan for her oven, wages for her bakers, and buys flour, sugar, yeast and diesel for the generator. All these are costs of production.
The short run and the long run
These are not fixed lengths of calendar time; they depend on whether inputs can be changed.
- Short run: a period in which at least one factor is fixed (for example the size of the bakery or the number of ovens). Output can be changed only by changing variable factors such as labour and flour.
- Long run: a period long enough for all factors to be varied. The bakery can move to a bigger building or install more ovens. There are no fixed costs in the long run.
For a sachet-water firm the long run may be a few months; for a refinery or steel plant it may be several years.
Classify each as a factor that is fixed or variable for the bakery in the short run: (a) the oven; (b) flour; (c) shop rent; (d) bakers paid per batch.
- (a) Fixed: cannot be changed quickly.
- (b) Variable: more bread needs more flour.
- (c) Fixed: paid whatever the output.
- (d) Variable: pay rises with batches.
Show solution
Continue this lesson in the free app →
Practice questions
- has at least one fixed factor
- can vary all factors
- has no fixed costs
- cannot produce
Show answer
A: has at least one fixed factor
Long run: all factors variable.
- ₦200
- ₦700
- ₦120
- ₦1,200
Show answer
D: ₦1,200
TC = FC + VC.
- stays constant
- equals marginal cost
- falls as output rises
- rises as output rises
Show answer
C: falls as output rises
AFC = FC ÷ Q.
- ₦1,900
- ₦100
- ₦1,000
- ₦10
Show answer
B: ₦100
MC = 1,000 − 900.
- fixed cost
- variable cost
- output
- diminishing returns
Show answer
A: fixed cost
FC does not change with output.
Key words
- Cost of production
- Expenses incurred by a firm in producing goods or services.
- Fixed cost
- Cost that does not vary with output in the short run, e.g. rent; also called overhead or supplementary cost.
- Variable cost
- Cost that varies with output, e.g. raw materials; also called prime or direct cost.
- Total cost
- Sum of fixed and variable costs at each output.
- Average fixed cost
- Fixed cost per unit: FC ÷ Q.
- Average variable cost
- Variable cost per unit: VC ÷ Q.
- Average total cost
- Total cost per unit: TC ÷ Q.
- Marginal cost
- Addition to total cost from producing one more unit.
- Explicit cost
- Actual money payment for inputs bought or hired.
- Implicit cost
- Value of the owner’s own resources used, which could have earned income elsewhere.
- Opportunity cost
- The value of the best alternative forgone.
- Total revenue
- Total receipts from sales: price × quantity.
The Cara's Tips app teaches every topic from the very basics, with quick checks, worked examples and exam practice. It works offline.